Project Vinyl involved the installation of a new ILP Separator (ILPB), located next to the existing ILP Separator (ILPA) at the Contact Energy Flash Plant 14 site in the Wairakei Steamfield. The integration of the new ILP-B Separator required modifications to the existing ABB 800xA control system for the new equipment integration and dump systems changes to bring in line with current Contact Energy standards for control and operating procedures.