Stage 1 electrical upgrade of the digester area at the Mangere wastewater treatment plant with the installation of supplies and switchgear to enable testing, commissioning and operation of a new eighth digester. The project included the upgrade of the control system for the valves for digesters one to seven.
McMahon Involvement
- Hardware and protection design (LV, MV)
- Planning
- Control system interface
- Equipment specifications
- Installation supervision
- Commissioning assistance