Speedies Power Station

A small scale, low impact, hydro generation scheme in the central north island. Generation is 1 x 2.2MW twin horizontal Francis turbine.

McMahon Involvement
  • Total hardware design (control systems, LV, MV)
  • Protection design
  • Software design for PLC logic and SCADA
  • Installation supervision
  • Commissioning
Category:
Date:
2010-2011
Client:
Clearwater Hydro