Huntly Power Station Coal Handling

Huntly Power Station Coal Handling

McMahon Involvement

McMahon were engaged to design the replacement coal handling and bunker switchboards at Huntly Power Station. This included planning for temporary supplies to maintain coal transport and station generation while the switchboards were replaced.

  • Design
  • Controls interface
  • 3.3kV switchgear modifications
  • Protection
  • Equipment and installation specifications
  • Installation supervision
  • Commissioning assistance
Date:
2008-2009
Client:
Genesis Energy Ltd