Whareroa Switchboard Replacements

Whareroa Switchboard Replacements

Investigation, cost estimates and replacement of nineteen motor control centres at the Fonterra Whareroa site as part of a 10year electrical upgrade plan. This included assistance with the design of new switchrooms, variable speed drive and soft starter replacements, distribution boards and supply cabling as required.

McMahon Involvement
  • Investigation, design and equipment specifications
  • Contract specification and management
  • Planning
  • Control system interfacing
  • Protection design
  • Installation supervision
  • Commissioning assistance
Client

Fonterra Co-Operative Group Ltd

Date

2007-Ongoing

Category

Dairy, Distribution