Investigation, cost estimates and replacement of nineteen motor control centres at the Fonterra Whareroa site as part of a 10year electrical upgrade plan. This included assistance with the design of new switchrooms, variable speed drive and soft starter replacements, distribution boards and supply cabling as required.
McMahon Involvement
- Investigation, design and equipment specifications
- Contract specification and management
- Planning
- Control system interfacing
- Protection design
- Installation supervision
- Commissioning assistance