New production wells, reinjection wells and reinjection pump station for Te Mihi Power Station.
McMahon Involvement
- Total hardware design (MV/LV/control systems) for total steam field design including;
- 12MVA substation
- 15km of 11kV overhead line
- 4 x 1500kW reinjection pump station
- 5 separate PLC systems with remote radio sites